ASTM

ASTM D711-23 82 PDF Download

Click here to purchase

1.1 This test method covers a laboratory procedure for determining the no-pick-up time of pavement markings. The method uses a wheel consisting of a metal cylinder with rubber O-rings. The wheel is rolled down a ramp over a freshly applied pavement marking film repeatedly until there is no transfer of the marking material to the rubber rings. The elapsed time from pavement marking film application to point of no marking material transfer is the no-pick-up time. Key variables to be controlled during testing are wet film thickness, temperature, humidity, air flow, and use of retroreflective optics. This standard provides three options for the testing of the no-pick-up time for pavement markings. The first option, Method A, specifies controls for temperature, humidity, and air flow during testing; a second option, Method B, specifies controls for temperature and humidity during testing, and a third option, Method C, provides guidance for performing this with a drop on application of retroreflective optics such as glass beads, Waterborne and Solvent Borne pavement markings are typically tested using Procedure A or Procedure B, without the application of drop on retroreflective optics. Pavement markings that are two component 100 % solids are typically tested using Method C.

Product Details

Published:
06/01/2023
Number of Pages:
9
File Size:
1 file , 550 KB
Redline File Size:
2 files , 860 KB
Note:
This product is unavailable in Russia, Ukraine, Belarus